|
TURKISH
STRAITS & ISTANBUL REGION - PORT OF HAYDARPASA

Black Sea
/ Straits
/ Marmara Sea
/ Aegean Sea
/
Mediterranean Sea
OPERATED BY: General
Directorate of Turkish Sate Railways (TCDD)
ADDRESS: TCDD Liman Isletmesi Mudurlugu Haydarpasa/Istanbul -
Turkey
TELEPHONE: (0216) 337 99 88 - 336 94 45 - 348 80 20
FAX: (0216) 345 17 05
LOCATION: 40° 59' 00" N, 28° 57' 00" E
The port of Haydarpasa is situated on the Anatolian side of
Bosphours in Istanbul. The port serves a
hinterland which is the most industrialized area of Turkiye. It has
a great importance being a gateway to
the world as the biggest container port In Marmara Region The port
has two breakwaters so as to protect
the vessels form all kinds of effects caused by the sea.
ANCHORAGE AREAS: please see "Anchorage Areas" in Turkish
Straits & Istanbul region (Information on best location of anchorage
will be given by Pilot station).
PILOTAGE: : is compulsory for berthing and unberthing and
anchoring, provided by the Turkish Maritime Organization.(TDI) .VHF
channels 14, 16. Pilots meet vessels West of a line passing through
the light on the breakwater of Kumkapi Fishing Boat Harbour.
TOWAGE: and/or mooring boat compulsory arranged by pilot and
and provided by the Port Administration (TCDD). VHF channels 12, 16.
BERTHING
|
BERTH NO |
BERTH GROUP |
LENGTH(m) |
DEPTH(m) |
|
1 |
Motor boat servicing |
150 |
-2
–4,5 |
|
2-3 |
General Cargo/Dry Bulk |
430 |
-5
–9.5 |
|
4-5 |
General Cargo |
334 |
-9
-9.5 |
|
6 |
General Cargo |
220 |
-9.25 |
|
7-8 |
General Cargo |
246 |
-9 |
|
9 |
General Carg |
206.5 |
-7 |
|
10-11 |
Container |
350 |
-7
–10 |
|
12A
– 12B |
Container |
300 |
-10 |
|
13-14 |
Container |
295 |
-7.5 – 8 |
|
15 |
General Cargo |
220 |
-7 |
|
16 |
General Cargo |
160 |
-6 |
|
17 |
Ro-Ro |
141 |
-7 |
|
18 |
Ro-Ro |
164 |
-7 |
|
19 |
General Cargo/Passenger (*) |
97 |
-6 |
|
20 |
General Cargo/Passenger (*) |
50 |
-6 |
|
21 |
General Cargo/Passenger (*) |
50 |
-6 |
(*) There are plans for
passenger vessels facilities
CARGO HANDLING EQUIPMENTS: The
floating crafts comprise 1 floating crane of 250 tons cap. 17 shore
and yard cranes of 3 to 35 tons capacity, 17 mobile cranes 5 to 25
tons capacity, 67 general cargo forklifts of 2 to 5 tons capacity, 1
loader, 6 tractors, 25 trailers of 40 tons capacity, 10 trailers of
20 tons capacity, weigh-bridges 2x100 tons. 2 rail ferries
STORAGE: Open storage areas 313.047 sq.m. and covered areas
21.043 sq.m and one container stacking areas 50.000 sq.m outside the
port for stacking the empty containers.
CONTAINER HANDLING FACILITIES: 4 container quayside gantry
cranes of 35 tons capacity, 16 reach stackers of 40 -42 tons
capacity, 9 transtainers of 40 tons capacity, 20 container forklifts
of 8 -40 tons capacity, 31 tug masters. The space for container
terminal is nearly 100.000 sqm. The holding capacity of
the container terminal is 6.000 TEU (both full and empty). The
annual capacity, on the other hand is 144.000 TEU/year.There are two
areas hired outside the port for stacking the empty containers. A
container freight station of 3.600 sq.m. is available behind the
container quay. Another facility available at the port is the
provision of reefer facilities for refrigerated containers.
RO-RO FACILITIES: Newly built modern ro-ro terminals is in
service. The ro-Ro terminals can accommodate 360 ships per year, and
can handle 410.000 tons/year of ro-ro cargo, 65.000 trucks (incoming-outgoing),
and 60.000 cars/year.There are daily Ro-ro services between
Haydarpasa and Trieste and Constanza ports.
BULK HANDLING FACILITIES: TMO Berths no: 2 and 3 serves the
dry bulk traffic. A grain silo of 70.000 tons capacity is available
and has a conveyor connection with the quay.
OTHER INFORMATIONS: A computer aided system for port
operations has already been set up.
DENSITY: 1014-1016 always variable due to strong currents.
FRESH WATER: available on the berths or by barge.
BUNKER: available by barge or trucks.
AIRPORT: At Istanbul distance apprx. 30 km and 25 km to
Sabiha Gokcen Airport from the port.
WORKING HOURS: operates 24 hours a day year round,
Administrative: 08.00-17.30hrs.
First Shift: 08.00-16.30hrs.
Second Shift: 16.30-00.30hrs.
Third Shift: 00.30-08.00hrs.
GARBAGE REMOVAL: service is available.
WASTE OIL DISPOSAL: An oil-water separator system available
at the capacity of 10.500 cu.m/year to clean bilge water in
conformity with the IMO regulations.
DOCUMENTS AND GENERAL VIEWS:
of these port; please see "A General View of Turkish Ports"
in the ports of Turkey section.
Black Sea
/ Straits
/ Marmara Sea
/ Aegean Sea
/
Mediterranean Sea
|